01 Generator terminals · 24 units
Delivered Voltage and frequency regulation under both no-load and load conditions, captured individually for each of the 24 engines. Non-negotiable on a multi-unit plant: each engine has to demonstrate its own AVR and governor behavior independently before the plant can be evaluated as a whole.
02 Interconnection point
Delivered Voltage and frequency regulation at the POI, primary frequency response, electrical-protection coordination, and the plant's behavior at the 230 kV interconnection bus.
03 Operational testing
Delivered Performance, reliability, and demonstration of startup and shutdown sequences across the 24-unit fleet.