Every project below represents a delivered engagement across the six grid code disciplines — testing, performance, power system studies, BESS compliance, regulator filings and generator condition — with named clients, named plants and verified capacities. Use the filters to narrow by client, technology, service or capacity range.

CT Pichilingue · New Fortress Energy · La Paz, México
50+ engagements · 25 GW+ aggregate · 10 OEM equipment platforms
Filter →
Showing 28 of 28 projects
Project Client Capacity Technology Scope Status
CCC Dulces Nombres
Pesquería, NL, Mexico
Quantum Energía 250 MW Single-Shaft Combined Cycle
Full MEM-migration grid code campaign plus dynamic-model authoring in PSS®E and EMTP. Night-shift campaign.
COD
CCC Salamanca
Guanajuato, Mexico
Mitsubishi Power 980 MW Combined Cycle
25 grid code tests for COD. Full plant testing including AVR, governor, performance, protections, PQ.
COD
CCC González Ortega
Mexicali, B.C., Mexico
Siemens 900 MW Combined Cycle
8 grid code tests across performance, electrical protections and power quality for COD.
COD
CCC Mérida
Yucatán, Mexico
Mitsubishi Power 500 MW Combined Cycle
25 grid code tests for COD. Full plant testing across all disciplines.
COD
Bajío Combined Cycle
Mexico
SAAVI Energy 500 MW GE 11 Steam Turbine
Evaluation of opening/closing of final control elements. CENACE/CFE compliant.
Completed
CCC Altamira
Altamira, Mexico
Valia Energía 500 MW Combined Cycle
Per-unit and per-plant for MEM migration. Heat consumption, start-up/shut-down costs.
In Progress
CCC San Luis Potosí
Villa de Reyes, Mexico
Mitsubishi Power 460 MW Combined Cycle
25 grid code tests for COD. Full plant testing.
COD
CCI Mexicali Oriente
Baja California, Mexico
Wärtsilä 440 MW Combustion Engines
Full 45 tests — AVR, governor, performance, electrical protections, power quality. COD.
COD
CCI Parque Industrial
Baja California, Mexico
Wärtsilä 240 MW Combustion Engines
Full 45 tests across all disciplines. COD.
COD
Costa Sur
Puerto Rico
GENERA 300 MW Steam Turbine · Upgrade
Voltage and frequency control testing for upgraded steam turbine following interconnection requirements.
COD
ENERTEK
Altamira, Mexico
Iberdrola 300 MW Steam Turbine · Upgrade
Voltage and frequency control testing for upgraded steam turbine.
Completed
CCC Saltillo
Mexico
Valia Energía 300 MW Combined Cycle
Per-unit and per-plant for MEM migration. Heat consumption, start-up/shut-down costs.
In Progress
Dulces Nombres
Mexico
Iberdrola 250 MW Single-shaft Combined Cycle
Full 45 CENACE grid code tests. Reports created and accepted by CENACE.
Completed
Tuxpan V Combined Cycle
Mexico
NAES 200 MW Mitsubishi Gas Turbines
OEL & MEL tests with Mitsubishi Electric for AVR tuning.
Completed
Tuxpan II Combined Cycle
Mexico
NAES 200 MW Mitsubishi Gas Turbines
OEL & MEL evaluation for AVR system tuning with Mitsubishi Electric.
Completed
Central Térmica Golfo
Tamuín, Mexico
AES 170 MW Alstom Steam Turbine · Petcoke
Grid code tests for petcoke-fired Alstom steam turbines.
Completed
Central Térmica Peñoles
Tamuín, Mexico
AES 170 MW Alstom Steam Turbine · Petcoke
Grid code tests for petcoke-fired Alstom steam turbines.
Completed
Tractebel Cogeneration
García, N.L., Mexico
ENGIE 170 MW GE MS7001 FA + Fuji Steam
Full 45 grid code tests for CENACE. Per-unit + interconnection point. Reports authored & accepted.
Completed
Cogeneración Cosoleacaque
Mexico
Global Contour 120 MW 3 × LM6000 + Siemens Steam
Per-unit and per-plant for MEM migration. Heat consumption curves.
In Progress
Central Térmica Pichilingue
La Paz, B.C.S., Mexico
New Fortress Energy 120 MW 3 × GE LM6000 Gas Turbines
Full lifecycle: Anexos III/IV, TICS, SAPPSE, grid code testing, Basler AVR tuning.
COD
ENGIE Pánuco
Altamira, Mexico
ENGIE 100 MW 2 × Solar MARS + GE LM6000
Grid code testing + Basler AVR tuning to CENACE criteria.
Completed
Pánuco Sugar Mill
Veracruz, Mexico
Grupo Pantaleón 45 MW WEG Steam Turbine
20 grid code tests for CFE/CENACE interconnection. Accepted.
Completed
Mante Sugar Mill
Tamaulipas, Mexico
Grupo Pantaleón 45 MW New Steam Turbine
Technical advisory + grid code testing during commissioning.
Completed
CCI Megasite Ixtlahuaca
Estado de México, Mexico
Telcel 7 MW MTU – Rolls Royce Combustion Engines · Data Center
Full 45 tests + dynamic modeling for Telcel data-center power plant.
In Progress
Rebasa Planta Monclova
Monclova, Mexico
Rebasa 5 MW 2 × Caterpillar Combustion
Full 45 CENACE tests. Industrial plant with grid export.
In Progress
LFGE Cadereyta
Nuevo León, Mexico
LFGE 1 MW Jenbacher Combustion Engines
Full 45 CENACE tests for new biogas plant from landfill.
COD
LFGE García
Nuevo León, Mexico
LFGE 1 MW Jenbacher Combustion Engines
Full 45 CENACE tests for new biogas plant.
COD
CCC Tuxpan Fase I
Veracruz, Mexico
Siemens 900 MW Combined Cycle
Inrush current measurement for first energization of step-up transformers.
Completed

50+ projects shown · Sorted by capacity (descending) · Request additional details →

Portfolio at a glance

A balanced book of work across technologies, OEMs and scale.

By Technology

All 50+ projects
Combined Cycle12
Combustion Engines5
Steam Turbines5
Gas Turbines (open cycle)3
Biogas / Landfill2

By OEM Equipment

Plants with named OEM
Mitsubishi5
GE4
Wärtsilä2
Siemens2
Jenbacher2
Caterpillar · Solar · WEG · Fuji5

By Capacity Range

Plant size at engagement
500+ MW8
100 – 499 MW10
10 – 99 MW3
Under 10 MW4
Unspecified capacity2
Start your project

Have a plant approaching commercial operation? Let's discuss your scope.

Tell us about your facility, technology and target jurisdiction. We'll come back within two business days with scope, schedule and quote.